In today’s industry most hard goods travel from the Far East and then into a distribution warehouse before getting to the consumer. Auditing this process helps to identify any areas that need improvement.
Transforming a product from a technical drawing to be a consumer ready can be a frustrating process. This process needs to be followed in line with a critical path (CPM), and this often results in a very short project time.
Our guidance covers all aspects of this path, including:
- Technical drawings
- Conducting inspections
- Samples
- Pre-production and pre shipment inspections
- Gap analysis can on the product and packaging
- Transit testing, such as drop testing
Our careful study of your paths we can help you get the best out of your product and will help the factory to understand the standards required.